04 ADNOC · Energy infrastructure

NOC Permitting Portal

A national permitting workflow for smart infrastructure installation across ADNOC locations in every UAE Emirate.

Role
Senior Software Engineer
Period
2023–2024
Primary outcome
Five-stage approval chain covering 72 sites across all seven Emirates.
Sanitized system modelCase file / 04
Inputs01Site request02Documents03Risk review
System5-stage approval
Outcomes04Site status05NOC decision06Audit trail

01 Context

The operational problem.

Infrastructure installations required a clear, accountable approval process involving multiple stages, locations, and government stakeholders.

Delivered approval workflows, site dashboards, application tracking, reporting, and a UAE-wide installation map.

02 Conditions

The constraints shaped the system.

  • 0172 sites
  • 02Five approval stages
  • 03Geospatial data
  • 04Government workflow

03 Engineering decisions

Clarity at system scale.

  1. 01

    Represented the approval lifecycle as explicit states with visible ownership and next actions.

  2. 02

    Connected map views to operational records so geography supported decisions rather than acting as decoration.

  3. 03

    Designed reporting and status patterns that remained consistent across sites and Emirates.

04 Outcomes

What the work enabled.

  • 01

    Created one view of permitting progress across a national site network.

  • 02

    Made approval ownership and bottlenecks visible at every stage.

  • 03

    Connected operational status with geographic context through Mapbox.

System stackNext.jsMUIMapboxApexChartsRTL/i18n